Thursday, June 16, 2011

Wednesday's progress... Lots of digging.

Wow!  That is going to be great!  They have all three of the downspouts tied in to the underground drain.  We will put something at the top to stop leaves and stuff from clogging up the drains.  Some sort of screen should work. 
You can't see very much of this, but there are two catch basins in each inside corner.  That is where most of the water runs when it rains.  These guys have done some serious digging around our cabin!  They've already covered the main part of the drain system.  Concrete is coming Thursday.   The last photo is of the West side of the cabin.  It will go all the way to the end of the back porch.  That should stop any run-off or drainage problems we're having.