We spent our first night here in the cabin Monday, August 6th. I knew we'd like this place, but, to be perfectly honest... We LOVE it!!!! It feels... like home.
I still have boxes of things here in the Sunroom that I can't find a home for. That comes from living in one house for more than 31 years. The Domestic Violence Thrift Shop in town like to see me drive up. While I have taken several boxes of clothes, it is the other things that makes them very happy. This past week I took a storage tub with the drapes that were here when we bought the cabin... a big box of Christmas decorations... Toys... Dishes... Pots & Pans... I have 2 or 3 boxes of unwanted books that I may take to them next week.
Oh!!! We finally got the Washer and Dryer hooked up!!! It is SO nice to be able to do laundry without carting it across the yard to the other house. Oh... I have some tile work to do.
There's more to tell you all, but that will have to wait til later. It's 55 degrees outside. I'm going to find the box of DuraFlame logs and watch one burn in the fireplace. Did I tell you how much I love this little Cabin??? :-)
Search This Blog
Saturday, October 6, 2012
Saturday, July 14, 2012
Interstate 40
Headed west. Was raining back in Arkansas about an hour ago.
70 degrees at 4:02pm. Feels great. It's been in the upper 90's at home for the past week. Before that it was 100's. We're ready for some cooler temps.
70 degrees at 4:02pm. Feels great. It's been in the upper 90's at home for the past week. Before that it was 100's. We're ready for some cooler temps.
Friday, July 13, 2012
Lavatory, door knobs & trim.
Things are moving right along since Shane got here!!! He is a great carpenter. A "finish" carpenter. :-)
He has fixed the trim around the front door. Both bathroom doors will stay open without something in front of them. The closet is ready to hang the wire shelving system. All the door knobs & all except 5 drawer pulls are attached. (I'm going to Lowe's to get those.) The trim at the bottom of the french doors & front door covers the ends of the oak flooring. And the guest bath looks great with the medicine cabinet up and the lavatory & fixtures installed.
There are several more things to finish up, but we are SO close!!!! I can't tell you how excited and anxious we are!!!!
He has fixed the trim around the front door. Both bathroom doors will stay open without something in front of them. The closet is ready to hang the wire shelving system. All the door knobs & all except 5 drawer pulls are attached. (I'm going to Lowe's to get those.) The trim at the bottom of the french doors & front door covers the ends of the oak flooring. And the guest bath looks great with the medicine cabinet up and the lavatory & fixtures installed.
There are several more things to finish up, but we are SO close!!!! I can't tell you how excited and anxious we are!!!!
Monday, July 2, 2012
A good reason...
Oh! Yes!!! There is a very good reason to put something over the floor before painting!!!!! LOL!!!!!
If... And when I finish the trim in this closet, I can put the wire closet system up. :-)
More photos later.
If... And when I finish the trim in this closet, I can put the wire closet system up. :-)
More photos later.
Sunday, July 1, 2012
Taking a break...
Shane, our new carpenter, has got just about all the trim & moulding put up. Leaving me the very boring job of filling nail holes, caulking the spaces between trim & drywall.
3:15pm. It's raining!!!!!! :-) can uncross fingers & toes. LOL!!!!
I don't have an umbrella down here.
The photo is looking NW across the lake from our back porch. :-) We are getting closer to the end of our very long tunnel!!! Oh! Wait!!! There is a light down there!!!! LOL!!!!!
3:15pm. It's raining!!!!!! :-) can uncross fingers & toes. LOL!!!!
I don't have an umbrella down here.
The photo is looking NW across the lake from our back porch. :-) We are getting closer to the end of our very long tunnel!!! Oh! Wait!!! There is a light down there!!!! LOL!!!!!
Subscribe to:
Posts (Atom)