Things are moving right along since Shane got here!!! He is a great carpenter. A "finish" carpenter. :-)
He has fixed the trim around the front door. Both bathroom doors will stay open without something in front of them. The closet is ready to hang the wire shelving system. All the door knobs & all except 5 drawer pulls are attached. (I'm going to Lowe's to get those.) The trim at the bottom of the french doors & front door covers the ends of the oak flooring. And the guest bath looks great with the medicine cabinet up and the lavatory & fixtures installed.
There are several more things to finish up, but we are SO close!!!! I can't tell you how excited and anxious we are!!!!
No comments:
Post a Comment