This is the master bathroom wall. :) We, John & I, decided not to put crown moulding at the top of the tile walls. It looks good with it stopping right there in the corner.
David and I were just down there to look at the latest supplies... That will be my next post. :)
The other side of that window. There's not much that has to be done here in this bathroom... Well, I do have to decide where to put a small ceiling fan & light.
I copy and pasted a picture of the fan from Lowe's website. There were 20 something reviews... all were positive comments. I saw it at Lowe's when we first started the demolision.
allen + roth 24" Roman Bronze Ceiling Fan
Window trim is done... Crown moulding is done... Vent is installed, cover is attached... This part of the bathroom is finished...
As soon as the flooring in the rest of the cabin is installed... the cabinets built and installed, doors installed... What else??? There will be some serious cleaning to do in there. But... that will be good! After the floor is down, I can order our storage bed. :)
This is the back of the shower wall. John did a really good job of finishing off that wall. It didn't look right with the tile stopping where it did. The casing trim with a little cut off one side was perfect! The texture is the same on the walls and ceiling. I love it!!!
The shower side of that wall. Another two months should have us moving in. That will give John time to get the floor down and get the cabinets finished???
That will also have me all finished with H & R Block!!!! YES!!!
That will also be a couple of anniversaries for me. High school graduation and wedding anniversary... both in May.
No comments:
Post a Comment